| Asset ID | Asset Name | Building | System | Condition | Replacement Cost | Priority | Status |
|---|---|---|---|---|---|---|---|
| FCA-HVAC-001 | Primary Chiller Unit A | Main Tower | HVAC | Critical | $485,000 | P1 | Scheduled Q3 |
| FCA-ELEC-017 | Main Switchgear Panel B | Main Tower | Electrical | Critical | $320,000 | P1 | RFP Issued |
| FCA-ROOF-003 | East Wing Roof Membrane | East Annex | Envelope | Critical | $275,000 | P1 | Bid Review |
| FCA-ELEV-002 | Elevator #2 Drive System | Main Tower | Conveyance | Poor | $210,000 | P2 | Planning |
| FCA-PLMB-009 | Domestic Water Booster Pump | West Wing | Plumbing | Poor | $85,000 | P2 | Approved |
| FCA-FIRE-011 | Fire Alarm Control Panel | South Complex | Fire/Life Safety | Poor | $145,000 | P1 | Emergency Fund |
| FCA-HVAC-023 | AHU-7 Supply Fan Motor | East Annex | HVAC | Poor | $42,000 | P2 | Ordered |
| FCA-STRC-005 | Parking Deck Level 3 Slab | Parking Structure | Structural | Poor | $520,000 | P2 | Engineering Review |
| FCA-BAS-014 | BAS Controller Node 14 | Main Tower | Controls | Critical | $68,000 | P1 | Vendor Engaged |
| FCA-ENVL-008 | Curtain Wall Seals Floor 8-12 | Main Tower | Envelope | Poor | $195,000 | P2 | Assessment Done |
Comprehensive overview of all managed properties across the FCA portfolio. Click any property for detailed system information.
Browse all 2,847 tracked assets organized by system category. Click a category to expand its subcategories and individual asset records.
Submit new condition assessments and review historical assessment data. All assessments follow ASTM UNIFORMAT II classification standards.
+ New Condition Assessment
| Date | Asset ID | Asset Name | Building | System | Rating | FCI | Est. Cost | Assessor | Priority | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| 2026-03-15 | FCA-HVAC-001 | Primary Chiller Unit A | Main Tower | HVAC | 1 - Critical | 0.45 | $485,000 | J. Mitchell, PE | P1 | Approved |
| 2026-03-14 | FCA-ELEC-017 | Main Switchgear Panel B | Main Tower | Electrical | 1 - Critical | 0.52 | $320,000 | S. Chen, PE | P1 | RFP Stage |
| 2026-03-12 | FCA-ROOF-003 | East Wing Roof Membrane | East Annex | Envelope | 1 - Critical | 0.48 | $275,000 | R. Williams, PE | P1 | Bid Review |
| 2026-03-10 | FCA-ELEV-002 | Elevator #2 Drive System | Main Tower | Conveyance | 2 - Poor | 0.35 | $210,000 | M. Garcia, CxA | P2 | Planning |
| 2026-03-08 | FCA-PLMB-009 | Domestic Water Booster | West Wing | Plumbing | 2 - Poor | 0.30 | $85,000 | D. Thompson | P2 | Approved |
| 2026-03-05 | FCA-FIRE-011 | Fire Alarm Control Panel | South Complex | Fire/Life Safety | 2 - Poor | 0.38 | $145,000 | J. Mitchell, PE | P1 | Emergency Fund |
| 2026-03-02 | FCA-HVAC-023 | AHU-7 Supply Fan Motor | East Annex | HVAC | 2 - Poor | 0.28 | $42,000 | L. Anderson | P2 | Ordered |
| 2026-02-28 | FCA-STRC-005 | Parking Deck Level 3 | Parking Structure | Structural | 2 - Poor | 0.33 | $520,000 | R. Williams, PE | P2 | Eng. Review |
| 2026-02-25 | FCA-BAS-014 | BAS Controller Node 14 | Main Tower | Controls | 1 - Critical | 0.55 | $68,000 | M. Brown | P1 | Vendor Engaged |
| 2026-02-22 | FCA-ENVL-008 | Curtain Wall Seals Fl 8-12 | Main Tower | Envelope | 2 - Poor | 0.31 | $195,000 | S. Chen, PE | P2 | Complete |
| 2026-02-18 | FCA-HVAC-002 | Primary Chiller Unit B | Main Tower | HVAC | 4 - Good | 0.08 | $485,000 | J. Mitchell, PE | P4 | Complete |
| 2026-02-15 | FCA-ELEV-001 | Elevator #1 Express | Main Tower | Conveyance | 4 - Good | 0.06 | $350,000 | M. Garcia, CxA | P4 | Complete |
5-year capital expenditure planning aligned with facility condition assessments and strategic objectives. All figures in current-year dollars.
| System | FY2026 | FY2027 | FY2028 | FY2029 | FY2030 | 5-Yr Total |
|---|---|---|---|---|---|---|
| HVAC | $1,450,000 | $1,680,000 | $1,920,000 | $1,240,000 | $980,000 | $7,270,000 |
| Electrical | $980,000 | $1,120,000 | $850,000 | $720,000 | $640,000 | $4,310,000 |
| Envelope/Struct | $875,000 | $1,350,000 | $2,100,000 | $1,800,000 | $920,000 | $7,045,000 |
| Fire/Life Safety | $520,000 | $380,000 | $290,000 | $450,000 | $310,000 | $1,950,000 |
| Conveyance | $425,000 | $680,000 | $520,000 | $350,000 | $280,000 | $2,255,000 |
| Plumbing | $300,000 | $420,000 | $380,000 | $520,000 | $340,000 | $1,960,000 |
| Controls/BAS | $250,000 | $580,000 | $920,000 | $640,000 | $420,000 | $2,810,000 |
| TOTALS | $4,800,000 | $6,210,000 | $6,980,000 | $5,720,000 | $3,890,000 | $27,600,000 |
Generate and review comprehensive facility condition reports, capital planning summaries, and compliance documentation.
FCA Portfolio Condition Report
Generated June 1, 2026 | Prepared by STARK INC Engine
1.0 Executive Summary
This Facility Condition Index (FCI) report presents a comprehensive assessment of the FCA Capital portfolio consisting of five (5) properties totaling approximately 1,200,000 square feet of managed space. The portfolio maintains an overall FCI score of 0.12, indicating good condition with targeted areas requiring capital investment.
The current replacement value (CRV) of all building systems is estimated at $127.4 million. Deferred maintenance backlog stands at $15.3 million, representing a 12% ratio against CRV. The portfolio requires an estimated $28.6 million in capital investment over the next five fiscal years to maintain current condition levels and address critical infrastructure needs.
2.0 Portfolio Overview
The assessment covers all major building systems across the ASTM UNIFORMAT II classification standard:
- HVAC Systems (487 assets) - Heating, ventilation, air conditioning, and refrigeration equipment including chillers, AHUs, boilers, cooling towers, and distribution systems
- Electrical Systems (523 assets) - Power distribution, emergency power, lighting, and specialty electrical systems
- Plumbing Systems (312 assets) - Domestic water, sanitary drainage, storm drainage, and specialty plumbing
- Fire/Life Safety (398 assets) - Fire alarm, sprinkler, standpipe, and emergency egress systems
- Conveyance (186 assets) - Elevators, escalators, and moving walkways
- Building Envelope (541 assets) - Roofing, curtain wall, glazing, waterproofing, and structural elements
- Controls/BAS (400 assets) - Building automation, metering, security, and access control systems
3.0 Condition Summary by Building
Main Tower (FCI: 0.08) - The flagship property is in excellent overall condition. Primary concerns include the aging Chiller Unit A (critical), Switchgear Panel B (critical), BAS Controller Node 14, and curtain wall seal degradation on floors 8 through 12. The building benefits from comprehensive BAS integration and recent LED lighting retrofit.
East Annex (FCI: 0.18) - This property shows fair condition with significant roofing concerns. The TPO membrane requires full replacement within the current fiscal year. AHU-7 supply fan motor is approaching end of life. The partial BAS system limits energy optimization capabilities.
West Wing (FCI: 0.05) - As the newest building in the portfolio, West Wing maintains excellent condition. The domestic water booster pump is the only item requiring near-term replacement. LEED Platinum certification is current, and the smart BAS provides optimal energy performance.
South Complex (FCI: 0.22) - This operations facility shows the highest deferred maintenance ratio. The fire alarm control panel requires emergency replacement to maintain code compliance. The generator backup system is functional but aging. Loading dock infrastructure shows wear patterns consistent with heavy use.
Parking Structure (FCI: 0.19) - Post-tensioned concrete slab repairs on Level 3 represent the largest single capital project need. Expansion joints throughout the structure require phased replacement. The recent LED lighting retrofit and EV charger installation demonstrate proactive investment.
4.0 Recommendations
- Immediately fund and execute P1 priority items totaling $1,293,000 in the current fiscal year
- Increase annual capital budget to $5.5M starting FY2027 to address growing backlog
- Commission full building envelope study for Main Tower curtain wall system
- Accelerate BAS modernization to enable predictive maintenance capabilities
- Establish dedicated parking structure repair fund of $200K annually
- Engage structural engineering firm for comprehensive parking deck assessment
Report Classification: Confidential - Internal Use Only
Prepared Under: ASTM E2018-15 Standard Guide for Property Condition Assessments
Assessment Team: James Mitchell PE, Sarah Chen PE, Robert Williams PE, Maria Garcia CxA
Next Full Assessment: Q1 2027
Connected systems and API integrations powering the FCA Capital Platform. All integrations run through the STARK INC Engine middleware layer.
All integrations route through the STARK INC Engine middleware layer for unified authentication, data transformation, rate limiting, and audit logging.
{
"engine": "STARK INC",
"version": "4.2.1",
"base_url": "https://api.stark-engine.todaye.ai/fca/v4",
"auth": {
"type": "OAuth 2.0 + API Key",
"token_endpoint": "/auth/token",
"scopes": ["read:assets", "write:assessments", "admin:config"]
},
"rate_limits": {
"requests_per_minute": 1000,
"burst_limit": 200,
"daily_quota": 500000
},
"endpoints": {
"assets": "/api/v4/assets",
"assessments": "/api/v4/assessments",
"work_orders": "/api/v4/work-orders",
"properties": "/api/v4/properties",
"capital_plans": "/api/v4/capital-plans",
"reports": "/api/v4/reports",
"integrations": "/api/v4/integrations/status"
},
"webhooks": {
"asset_status_change": "https://hooks.stark-engine.todaye.ai/fca/assets",
"work_order_created": "https://hooks.stark-engine.todaye.ai/fca/wo",
"assessment_completed": "https://hooks.stark-engine.todaye.ai/fca/assess"
},
"monitoring": {
"health_check": "/health",
"metrics": "/metrics",
"uptime_sla": "99.95%"
}
}